Rize Artvin airport is second project that was built on sea, after Ordu-Giresun airport. The airport will serve 2 million passengers annually when it is completed. Product supply, project support, commissioning-supervision service of weak current signal were provided for the airport building.
Project Name : WEAK CURRENT SYSTEMS UNDER RİZE ARTVİN AIRPORT ELECTRICAL WORKS
Place of Project: RİZE
– CCTV SYSTEMS
– ACCESS CONTROL SYSTEMS
– FIRE DETECTION AND ALARM SYSTEMS
– PUBLIC ADDRESS and VOICE ALARM
– VIP TURNSTILE SYSTEMS
– WALK-THROUGH AND HELD METAL DEDECTORS
– IP CALL CENTER SYSTEMS